To Do List

After Hand-Over

Task People Time needed comments
Network: installing 5 WiFi access points 2 1 to 4 work periods, see comments

It really depends on how the holes in the ceiling were drilled and whether they’ll allow us to easily attach the mounting kits.

 

If the holes are larger than the screw holes on the mounting brackets, it could be more challenging and may require some kind of reinforcement within the ceiling, like what happened at NAB. However, if the holes are the correct size for our mounting kits, the installation should be straightforward and can be completed in a morning or two.

 

By that time, the Ethernet cables will be live and ready to power the preconfigured access points. Once connected, they’ll immediately broadcast our usual networks; as such, this task can be handled by anyone with general workshop skills; it doesn't necessarily have to be the network monks (in case we're not around, e.g. Kathinas, etc.)

Create Documentation and label for training and maintenance.



I would be in favour of having some wall file holder to store manuals and documentation next to the appliance (like the complex AV mixer) and make sure it is all label appropriately. 

Move Shrine and Buddha




Move Books

 




Move Furnitures




Make Plynth for Buddha



Ajahn Aryo (no)

Garbage Transition




Space for Bodhi Tree




Fire Proof cabinet in the workshop (paint room, next to sink)




Monastic Phone




Check Pre List By Ajahn Narindo

 




WorkShop Hoister Whinch




Before Hand-Over

  • Share Calendar at large
  • Signage Planning 
    • Pipes are 35 - 45 - 55 mm diamteer
    • Need clamps
    • screw
    • bolts
  • Make plywood 10cm by 10cm spread load plates
  • Contact Ajahn Sona for Recording setup
  • Fire Officer
  • Book Inventory
  • MP Room planning
  • Order Toilet and cleaning items Toilets & Cleaners Sluice
  • Order Monastics phone rooms
  • Order shelves for storage
  • rubber feet research
  • Plynth Ajahn Ariyo for nich buddha (last week of November)
  • MP room, lounge room with table
  • Disable parking blue sign
  • Make sure we have all the manuals and they are available on the wiki and in situ
  • Calendar

Tan Cittadhammo

  • Explain Wiki to the 6s Team
  • Presentation at the Bhikkhu Samanera Meeting (21st) of the job of the Transition Officer and the Wiki
    • Wiki
    • 6s transition
    • 3d Printer
  • Filling the information about the different plan into the subsection
  • Getting the different parties involved (networks, etc.)
  • Creating a detailed schedule and checking all the different areas with their requirements.
  • Doing the Current Inventory
  • Measuring the Storage Area
  • Creating a Buying List

Meeting with People

  • Maria & Genna
  • Jina
  • Joshua & Harry
  • Maurice and Eleonora
  • Youg Maew
  • Chathumini (est@amaravari.org)
  • Ajahn Amaro (before 3rd of Sept) 

[Q][K] https://amaravati.org/rebuilding-amaravati/rebuilding-the-sala-and-kitchen/ talks about a list