Network
Team
T. Adicco, T. Samahito, T. Nipako (from 29th of July)
- Network Transition Officer: Tan Adicco
- IT Admin : Tan Adicco (Tan Samahito)
- Network Admin: Tan Samahito (Tan Adicco)
Responsibility
- Arrange switch over
- Making sure that there is a working Wi-Fi access point everywhere in the main building
- Workshop ?
- 2 office have Ethernet cable
- Wi-Fi access point (for 3D printer if possible, it might be around the offices or in the paint store)
- Garage: no need of anything
- Workshop ?
TBC: the contractor will install all the access point and data point shown on the plan. [Q]
Documents
6s Network Acquisitions
Rachaya will arrange the actual switching and the installation by the subcontractor. She won't be involved with the internal network installation by the Network Monk and buying of the equipment that the monastery needs. Tan Addico will arrange that with Tan Cittadhamma Sala transition officer
Plan
Operators
- BT & OpenReach (maintain BT lines)
- Until the entrance to the monastery
- Zen (push the data in the lines of BT)
- TP&N (install cable in the monastery)
- From the entrance to the switch boxes
- ABM
- install the cables from the switch boxes to the offices and appliances
Switch Over
New main entrances for the Fiber Optic in the Workshop instead of Aroga.
How long would the cut last, I don't know, I can ask Rachaya. [Q][R]
Transition options: https://docs.google.com/document/d/17NKclwmuUPWDnDTJFnnj2kUQ0tBgRRltadvdnTrGX6s/edit?usp=sharing
Network Maps before / after the transition
On the left side, before the transition, on the right side, after. Click on it to see them bigger.