To Do List
After Hand Over
Task | People | Time needed | comments |
Network: installing 5 WiFi access points | 2 | 1 to 4 work periods, see comments |
It really depends on how the holes in the ceiling were drilled and whether they’ll allow us to easily attach the mounting kits.
If the holes are larger than the screw holes on the mounting brackets, it could be more challenging and may require some kind of reinforcement within the ceiling, like what happened at NAB. However, if the holes are the correct size for our mounting kits, the installation should be straightforward and can be completed in a morning or two.
By that time, the Ethernet cables will be live and ready to power the preconfigured access points. Once connected, they’ll immediately broadcast our usual networks; as such, this task can be handled by anyone with general workshop skills; it doesn't necessarily have to be the network monks (in case we're not around, e.g. Kathinas, etc.) |
Tan Cittadhammo
- Explain Wiki to the 6s Team
- Presentation at the Bhikkhu Samanera Meeting (21st) of the job of the Transition Officer and the Wiki
- Wiki
- 6s transition
- 3d Printer
- Filling the information about the different plan into the subsection
- Getting the different parties involved (networks, etc.)
- Creating a detailed schedule and checking all the different areas with their requirements.
- Doing the Current Inventory
- Measuring the Storage Area
- Creating a Buying List
Meeting with People
- Maria & Genna
- Jina
- Joshua & Harry
- Maurice and Eleonora
- Youg Maew
- Chathumini (est@amaravari.org)
- Ajahn Amaro (before 3rd of Sept)
[Q][K] https://amaravati.org/rebuilding-amaravati/rebuilding-the-sala-and-kitchen/ talks about a list