To Do List

After Hand Over

Task People Time needed comments
Network: installing 5 WiFi access points 2 to 4? 1 to 4 work periods, see comments

Really depends on how the holes were dug in the ceiling and whether they will enable us to attach the mounting kits easily or not.

If the diameter of the holes is larger than the one at which the screw holes are located on the mounting bracket, it will be more difficult, as it might require some sort of counterpane within the ceiling. This is what happened at the NAB. If they are however 'right' for our mounting kit, it is an easy job and can be done in one morning.

The Ethernet cables will be live and ready to power the access points, which have been preconfigured. As soon as they are plugged in they will broadcast our usual networks and be immediately usable.









Tan Cittadhammo

  • Explain Wiki to the 6s Team
  • Presentation at the Bhikkhu Samanera Meeting (21st) of the job of the Transition Officer and the Wiki
    • Wiki
    • 6s transition
    • 3d Printer
  • Filling the information about the different plan into the subsection
  • Getting the different parties involved (networks, etc.)
  • Creating a detailed schedule and checking all the different areas with their requirements.
  • Doing the Current Inventory
  • Measuring the Storage Area
  • Creating a Buying List

Meeting with People

  • Maria & Genna
  • Jina
  • Joshua & Harry
  • Maurice and Eleonora
  • Youg Maew
  • Chathumini (est@amaravari.org)
  • Ajahn Amaro (before 3rd of Sept) 

[Q][K] https://amaravati.org/rebuilding-amaravati/rebuilding-the-sala-and-kitchen/ talks about a list