Network
T. Adicco, T. Kossalo, T. Nipako (from 29th of July)
Operators
- BT
- OpenReach (maintain BT lines)
- Until the entrance to the monastery
- Sain (push the data in the lines of BT)
- TP&N (install cable in the monastery)
- From the entrance to the switch boxes
- ABM
- install the cables from the switch boxes to the offices and appliances
Switch Over
New main entrances for the Fiber Optic in the Workshop instead of Aroga.
September