Skip to main content

Network

T. Adicco, T. Kossalo, T. Nipako (from 29th of July)

6s Network Acquisitions

Operators

  • BT
  • OpenReach (maintain BT lines)
    • Until the entrance to the monastery
  • Sain (push the data in the lines of BT)
  • TP&N (install cable in the monastery)
    • From the entrance to the switch boxes
  • ABM
    • install the cables from the switch boxes to the offices and appliances

Switch Over

New main entrances for the Fiber Optic in the Workshop instead of Aroga.

September