Network
Team
T. Adicco, T. Kossalo, T. Nipako (from 29th of July)
Documents
Ratchaya will arrange the actual switching and the installation by the subcontractor. She won't be involved with the internal network installation by the Network Monk and buying of the equipment that the monastery needs. Tan Addico will arrange that with Tan Cittadhamma Sala transition offficer
Operators
- BT
- OpenReach (maintain BT lines)
- Until the entrance to the monastery
- Sain (push the data in the lines of BT)
- TP&N (install cable in the monastery)
- From the entrance to the switch boxes
- ABM
- install the cables from the switch boxes to the offices and appliances
Switch Over
New main entrances for the Fiber Optic in the Workshop instead of Aroga.
September