Skip to main content

To Do List

On going Job

  • Garden - Graham (2/3)
  • Grounds - Joshua (2/3)
  • Jet-washer for Declan
  • *Window Cleaning - Chris Claudius
  • *Gutter Cleaning (2)
  • *BV Door - Tahn Jalito

One time Job

  • Remove Vegetation in Heartwood House (see Ajahn Kongrit, mama & Bambino)
  • ^Repair Railings in Heartwood House (see Ajahn Kongrit)
  • *Clean outside windows of the Bhikkhu Vihara (especially those facing the inner gardens)
  • Lights in the Boiler Room Container
  • !Move windows and doors to the barn (there are many lying around the workshop).
  • !Move Appliance to the barn 
    • old boiler, fan, etc.
  • Sell the empty propane tanks.
  • Sort José's things (ask Ajahn Amaro?):
    • 2 top shelves at the entrance to the workshop outside (torch, chainsaw, plastic box)
    • 1 motorbike
  • Sort kitchen shelves in trailer behind workshop.
  • Move items to skip.
    • contact site.manager if skip is full
  • Cut scrap metal for easy handling.
  • !Tidy and organizeorganise materials behind the kitchen:
    • Stack similar materials
    • Protect from rain and leaves with metal sheets
    • Make a passage between the materials for easy access
    • Tarpaulins should be folded and stored in a dry place (there is more in the recycling shed).
  • Sort the wood outside the workshop:
    • Stack similar size and length
    • Sort out small pieces for scrap
  • Sort out clothes:
    • Under the workbench outside the workshop next to the entrance
    • Under the bench next to the sink inside
  • Sort out the paint room in the workshop and the paint accessories shelf outside the paint room.
  • Tidy up the sandpaper area under the workbench in the workshop:
    • Scrap small and used pieces
    • Cut good pieces into squares with scissors
    • Sort by grit (number behind the paper).
  • ^Change Light bulb in the kitchen (for maintenance)
  • Lights in the Boiler Room Container

Legend

*: Bhikkhu Friendly
^: skill in repair
!: heavy lifting
(): number of people