To Do List
On going Job
- Garden - Graham (2/3)
- Grounds - Joshua (2/3)
- Jet-washer for Declan
- *Window Cleaning - Chris Claudius
- *Gutter Cleaning (2)
- *BV Door - Tahn Jalito
One time Job
- Remove Vegetation in Heartwood House (see Ajahn Kongrit, mama & Bambino)
- ^Repair Railings in Heartwood House (see Ajahn Kongrit)
- *Clean outside windows of the Bhikkhu Vihara (especially those facing the inner gardens)
- !Move windows and doors to the barn (there are many lying around the workshop).
- !Move Appliance to the barn
- old boiler, fan, etc.
- Sell the empty propane tanks.
- Sort José's things (ask Ajahn Amaro?):
- 2 top shelves at the entrance to the workshop outside (torch, chainsaw, plastic box)
- 1 motorbike
- Sort kitchen shelves in trailer behind workshop.
Move items to skip.contact site.manager if skip is full
Cut scrap metal for easy handling.- !Tidy and organise materials behind the kitchen:
- Stack similar materials
- Protect from rain and leaves with metal sheets
- Make a passage between the materials for easy access
- Tarpaulins should be folded and stored in a dry place (there is more in the recycling shed).
- Sort the wood outside the workshop:
- Stack similar size and length
- Sort out small pieces for scrap
- Sort out clothes:
- Under the workbench outside the workshop next to the entrance
- Under the bench next to the sink inside
Sort out the paint room in the workshop and the paint accessories shelf outside the paint room.- Tidy up the sandpaper area under the workbench in the workshop:
- Scrap small and used pieces
- Cut good pieces into squares with scissors
- Sort by grit (number behind the paper).
- ^Change Light bulb in the kitchen (for maintenance)
- Lights in the Boiler Room Container
- https://www.amazon.co.uk
- If you have more budget https://generator-pro.co.uk/product-category/off-grid-lighting-kits/
Legend
*: Bhikkhu Friendly
^: skill in repair
!: heavy lifting
(): number of people