Audio Video

Dates

End of September/early October equipment is ready to be tested

Video Team

Members

  • Tan Issaro, 
  • Anagarika Egle and
  • Anagarika Deepa,

Responsibility

  1. Setting up the camera in the new Sala (high priority)
    1. Starting with one camera, possibly able to be mounted on two location?  
    2. Connecting the camera to the network for live-streaming
    3. Connecting the camera to the recorder for video editor
    4. Establishing a routine for the video officer and video editor and their operation
      1. Who will be in charge or operating, editing, posting, etc.
      2. Documenting the procedures
  2. Setting up the lighting (high priority)
  3. Setting up the AV room and Camera cupboard with all the items needed (work with audio team) 
    1. Furnitures, 
    2. Shelving
    3. etc.
  4. Setting up the projector 
    1. We need to buy the projector (ultra short through doesn't have to be, but seems to be a good option)
    2. Electric Sockets are on the walls
    3. Video sockets ? 
    4. Ethernet socket ?
    5. Contractor provide up to the socket (ceiling speakers are included) 
    6. Screen is already installed, remote to control it. (should be fixed to the wall)

Budget

  • There is a budget to buy equipment and furniture

Specs

  • Rachaya will share the specs of the rooms

Tan Jalito's comments

  • No portable equipment (easy training, low maintenance)
  • Preferable fix, stationary equipment. 
    • Many cons for portable.
  • Camera for Sunday talks, rarely used (12 a year)
  • Other camera for different angle to record Aramoana?
  • Temple camera works well and easy to use (preset) PTZ camera (expansive) 

Audio Team

Members

  • T. Issaro
  • T. Jalito
  • + T. Issaro +
  • T. Karunno

Responsibility

Levels
  • Setting up and test the audio equipment that is necessary to do the PA from the different locations:
    • In front of installation

Main install,the main equipmentshrine is

  • In purchasedfront of the secondary shrine (niche)
  • In the monk eating area
  • In the cloister
  • Note: Audio Mixer desk, amp and installedwireless and wired (?) microphone need to be provided by contractors.

    us.

    Client(this briefcontradicts plugthe andprevious play.information I was given) Contractor provide up to the socket (ceiling speaker are included) 

  • Audio Mixer desk

  • Setting up the audio equipment that is necessary to record Dhamma talks (check with video team above)
  • Setting up the AV room and microphoneAudio needcupboard towith beall providedthe byitems us.

    needed

    Cabinet, furniture, mics, ... is purchase(work with thevideo transitionteam) budget.

    1. Furnitures, 
    2. Shelving
    3. etc.
  • TestingBudget

    • 4There microis socketa budget to testbuy equipment and furniture

    Specs

    • TestRachaya will share the wireless mic receive, In frontspecs of the shires and in the eating area for monks.
    • Micro in the cloister (another receiver) rooms

    Plans

    AV Store

    image.png

    Camera Cup'd

    image.png

    image.png