Work Monk

To Do List

On-going Job

One time Job

Legend

*: Bhikkhu Friendly
^: skill in repair
!: heavy lifting
[]: number of people
(): comments

Log

Sep 2023

Aug 2023

Kuti Building

Kuti Building

To do

Send budget to Chris 

Windows


Roof


Walls


Interiors


Under


Work Monk

Tools

Duty

  1. Report to ABC by responding to abcsecretary@amaravati.org via agenda email
  2. work meeting at 8:15 everyday
    1. Remind people that tea time is at 9:45-10:00
    2. Health and safety
      1. able bodies
      2. gloves, shoes, clothes
  3. Communication with the nuns
    1. Work Breakfast (maintenance, ++) 

Communication

  1. Site Manager (Eleonora): contractor, tools, buying something
  2. Maintenance (Maurice)

Guest

Guest who are in the kitchen during WP or QD, the y don't need to come to the work meeting.

Access to Booking sheet see Password

2025 Job List

Update April 4th

  1. Clean and level all the shelves and table in the new workshop
    1. The metal section table could ideally be levelled under the window seal.
  2. Move maybe one or two more stainless steel tables to the paint store. (I thought that the one in the RC container might be too big, but actually, it could work well. To be tested. 
  3. Building shelves and coat hanger in open garage. (need to buy more rails for our brackets, needs research, Eleonora might help)
  4. Move or dispose pile outside workshop to furniture store.
  5. Denailing wood scrap and fill out the trailer (when it is hooked to the shogun) 
  6. adjusting Stoppers on the hanging power plug so that they don't go up to the ceiling in the new workshop

To-do list after the WR 2025

  1. Install outdoor wood sign 
    1. Back kitchen door, next to flower shed : KITCHEN
    2. 3 parking spaces opposite to flower shed : PARKING
    3. GARDEN SHED
    4. Workshop left door  (divert traffic from offices) : WORKSHOP 
    5. In the second gate of the monastery, viewing from outside: NO ENTRY
  2. Paint the side faces of the outdoor arrow signs black (opposite to the arrow end) 
  3. Paint the post of the signs post with rustoleum black
  4. Check all ABM to complete in the snagging list
  5. Emergency light testing with Tan Pasado (round 2)
  6. Kitchen mop rack
    1. Need to install a rack system to hand the mops outside the kitchen
    2. Towel hanger
  7. Training for dishwasher (7th of April)
  8. Training for Ventilation (3rd of April)
  9. Removing the roof behind the RC (Retreat Centre) Kitchen. This will free the blue containers which could be sent back to the company we are renting them to. (see next point)
  10. Emptying and consolidate items in storage container (blue container, only books, check with Tan Balado?)
    1. Empty one can be return to the company we are renting them to if not needed by phase7b (check with Ajahn Asoko bhikkhuasoko@gmail.com and Caroline caroline@amaravati.org)
    2. This cost quite a bit and so is a priority.
    3. Copy ADL and pahse7b poeple when dealing with this 
  11. Moving into the new workshop
    1. See Workshop Transition Guide on this page (in construction) 
      1. Build storage spaces (shelves, rack, cabinet, tool boards, etc.) 
      2. Install furniture (tables, bench tools (connect electricity, key lock and safety button) and connect dust extraction. 
      3. Move items (tools, building materials, etc.)
      4. ...
    2. See Workshop Buying List on the same page
  12. Fence Repair
  13. Dewinterization
  14. Remove monastery maps signs (big plastic map) outdated
  15. Redo new maps
  16. Remove broken felt from bottom of blue chairs in the Sala (check with Aj. Ruciro)